综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

Northeast bullet train section begins trial runs

By Wu Yong in Shenyang | China Daily | Updated: 2018-03-02 08:17
Share
Share - WeChat

Line linking Beijing, Shenyang to cut travel time nearly in half

The Liaoning section of the Beijing-Shenyang high-speed railway began its first trial run on Thursday morning, testing the line's power supply equipment, according to project officials.

The railway linking Beijing and Shenyang, Liaoning province, is about 700 kilometers long, and trains will run at speeds of up to 350 kilometers per hour. The line will cut travel time between Beijing and Shenyang from 4.5 hours to 2.5 hours.

The project, which costs 124.5 billion yuan ($20.4 billion), was launched in July 2014 as part of the Beijing-Harbin high-speed railway. It is considered a vital link connecting Beijing with Northeast China.

It is also the only part of China's high-speed rail network - comprising four north-south lines and four east-west lines - that remains unfinished.

Zhang Yuehan, senior engineer of the Shenyang railway bureau's planning and statistics department, said the line would smooth transportation between Beijing and Heilongjiang, Jilin and Liaoning provinces.

"The Beijing-Shenyang line will become the fastest access to the northeastern region, as the entire northeastern railway network will be interconnected with the national high-speed railway network and thus form an efficient and convenient rapid transport network," Zhang said.

Wang Min, who works for an import-export company in Shenyang said, "With the new train, I can go to Beijing in the morning, visit clients and return home at night. It will save me both money and time."

Besides its economic benefits, the project has developed more than 70 types of new technologies and equipment to ensure high quality across the system, according to Wang Zhipeng, chief of Beijing-Shenyang HSR Liaoning Co.

For example, new track plates with sensors can provide real-time monitoring. Also, 500-meter-long rail sections will reduce maintenance and improve passenger comfort.

Tests of the Liaoning section are expected to be completed in the second half of this year. Workers need to inspect all systems, including rails, bridges, electrical systems and signals. The line's section in Hebei province will also be tested.

Zhu Lin contributed to this story.

wuyong@chinadaily.com.cn

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
合江县| 浑源县| 扶绥县| 习水县| 宜兰市| 承德市| 阿鲁科尔沁旗| 平顶山市| 龙泉市| 两当县| 瓦房店市| 固原市| 建湖县| 南充市| 平度市| 青神县| 正定县| 乐平市| 双鸭山市| 宜昌市| 云安县| 沙洋县| 宝丰县| 通江县| 萨嘎县| 汝州市| 温宿县| 云霄县| 阿图什市| 黄大仙区| 黄平县| 明水县| 崇文区| 赤壁市| 新平| 汉源县| 鹿邑县| 仙桃市| 龙井市| 乌海市| 西和县|