综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Eight things you need to know about Hong Kong-Zhuhai-Macao Bridge

By He Shusi | chinadaily.com.cn | Updated: 2018-10-23 15:14
Share
Share - WeChat
The bridge seen during construction in November 2017. [Photo by ROY LIU/CHINA DAILY]

6. When did construction start? What was the cost?

The plan to build a link road across the Pearl River Estuary was first initiated by Hong Kong industrialist Gordon Wu Ying-sheung in 1983. After several twists and turns, the Feasibility Study started in March 2004 under State Council's approval. The study report was approved in October 2009, followed by a commencement ceremony on Dec 15 in the same year, chaired by then-vice-premier Li Keqiang in Zhuhai.

So far, the total cost of HZMB is about 120 billion yuan ($17.4 billion), of which the 29.6-km Main Bridge invested by three governments is about 48.1 billion yuan. The rest are investments by individual governments on their ports and link roads to the Main Bridge.

The cost allocation among the three governments shown as above is settled by the assessment of economic benefits they can get after the bridge opens.

|<< Previous 1 2 3 4 5 6 7 8 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
辉县市| 彭州市| 安塞县| 兰坪| 盐亭县| 栖霞市| 阳春市| 定日县| 名山县| 丽水市| 凤庆县| 玉环县| 郑州市| 泾阳县| 霍州市| 万州区| 岑巩县| 龙陵县| 绵竹市| 宜丰县| 馆陶县| 噶尔县| 常德市| 奈曼旗| 元阳县| 建瓯市| 康马县| 石楼县| 芦溪县| 肥城市| 拜泉县| 永德县| 织金县| 上林县| 盐池县| 龙山县| 苍南县| 中西区| 高青县| 镇宁| 定南县|