综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
World
Home / World / Europe

Laying of last pipe of Nord Stream 2 pipeline completes

Xinhua | Updated: 2021-09-07 09:59
Share
Share - WeChat
This picture posted on the website of Russian energy giant Gazprom shows Nord Stream 2 pipe-laying operations in German territorial waters.

MOSCOW - The last pipe of the two strings of the Nord Stream 2 pipeline was welded, Nord Stream 2 AG, the operating company, said in a press release Monday.

"On September 6, 2021, specialists on the laybarge Fortuna welded the last pipe of the two strings of the Nord Stream 2 Pipeline," the company said.

"As the next step, the section of the pipe coming from the German shore will be connected to the section coming from the Danish waters in a so-called above water tie-in," it added.

The company intends to put the Nord Stream 2 gas pipeline into operation before the end of the year. It said the project will ensure gas supply security and reliability, and "contribute to meeting long-term needs of the European energy market for gas imports."

The 1,230-km gas pipeline would bring 55 billion cubic meters of gas annually from Russia to Germany through the Baltic Sea.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
奉贤区| 赣州市| 田东县| 鄂托克前旗| 兴仁县| 呼伦贝尔市| 永和县| 华安县| 佳木斯市| 衡阳县| 遵义县| 慈利县| 正镶白旗| 屏东市| 南阳市| 马山县| 大埔区| 柏乡县| 临安市| 长阳| 芷江| 治多县| 博爱县| 朝阳区| 盐池县| 汨罗市| 桃园市| 文登市| 乌兰察布市| 滨海县| 万载县| 普安县| 保靖县| 涟源市| 张家界市| 天全县| 通州市| 乐至县| 大庆市| 吴旗县| 杭锦后旗|