综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

From hills to hope

Water project drives development in the highlands of Lesotho

Updated: 2025-07-28 10:39
Share
Share - WeChat
Trucks transport components of the tunnel boring machine on a mountain road in Thaba-Tseka on July 8. YANG GUANG/XINHUA

The 38-kilometer tunnel will be excavated using two hard-rock shielded tunnel boring machines, operating simultaneously from Polihali and Katse Dam.

The first tunnel boring machine began boring from Katse earlier this year. On July 5, a launch ceremony was held for the second tunnel boring machine at the Caledonspoort Border Post in Butha-Buthe, Lesotho. This China-manufactured machine was shipped to Durban Port and assembled at the Polihali site. It is expected to significantly speed up excavation process to meet the slated 2028 completion date.

Speaking at the ceremony, South Africa's High Commissioner to Lesotho Constance Seoposengwe said she believed the new machine would give further impetus to the ongoing work on the project.

|<< Previous 1 2 3 4 5 6 7 8 9 10 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
永春县| 安徽省| 彭州市| 大邑县| 西乌珠穆沁旗| 大宁县| 铜鼓县| 蒲城县| 洮南市| 兰坪| 信阳市| 兴仁县| 政和县| 武乡县| 兴文县| 尉氏县| 尚义县| 南漳县| 揭阳市| 临夏县| 汤原县| 泾源县| 北碚区| 临朐县| 尚志市| 尖扎县| 政和县| 大方县| 怀柔区| 临高县| 新营市| 黑山县| 开平市| 嘉峪关市| 当涂县| 马鞍山市| 乌苏市| 宣城市| 贵南县| 固镇县| 镇远县|