综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

chinadaily.com.cn
left corner left corner
China Daily Website

Chemical plant fine called not enough to deter

Updated: 2013-01-26 03:47
By Wu Wencong ( China Daily)

Experts called for heavier penalties to be imposed on chemical projects violating environmental laws after the Environment Ministry fined a project in East China 200,000 yuan ($32,130).

The ministry also halted construction of the plant in Zhangzhou, Fujian province, designed to produce 800,000 metric tons of paraxylene, or PX, a year. Paraxylene is a chemical used to manufacture pesticide, plastics and polyester, and poses a health risk in humans.

The plant was originally planned for the tourist city of Xiamen, which is also in the province. But after thousands took to the streets in the city in 2007 to protest the project, it was relocated to Zhangzhou in 2009.

According to an investigation by the ministry, the company in charge of the project, Dragon Aromatic Hydrocarbon, decided to change the raw materials used to produce PX, because they cannot be easily bought. But it did not seek approval from the ministry for the change, China Economic Net reported.

The ministry has asked the company to hand in a report of how it has corrected its violations, before Feb 28, adding that it must not resume construction before getting approval.

Experts said heavier penalties should be given to those who violate environmental laws.

"Though the ministry imposed the maximum fine stipulated by the law — 200,000 yuan — it is still too little compared with the project's 20 billion yuan investment and output value it will bring," said Ma Jun, director of the Institute of Public and Environmental Affairs, an environmental NGO.

"The light punishment fails to act as a deterrent," Ma said.

Ma said the penalty for violating environmental laws is too low to deter large chemical companies.

A senior official from the Fujian Provincial Environmental Protection Department, who declined to be named, said penalties should be raised to keep abreast with the times. The law on the penalties was introduced in 2003.

It is not the first time the PX project has violated the law. In 2007, experts from the ministry found that the owner, a sister company of the one running the plant in Zhangzhou, started the project five years ago without permission from the ministry, and the pollutants emitted never met national standards.

When the project was relocated to the Gulei Peninsula in Zhangzhou, it had full support from the provincial and municipal governments, and was labeled as "a miracle" by local media, with an investment of 20 billion yuan in less than three years, the largest amount on a single project in the city's history.

Output value of the project in the first year is estimated to be 45 billion yuan and it will pay 3 billion yuan in tax, according to the China Inspection and Quarantine Times.

Sun Li contributed to this story.

Contact the writer at wuwencong@chinadaily.com.cn

 
...
浪卡子县| 镇原县| 镶黄旗| 嘉禾县| 贡觉县| 蒙山县| 宁南县| 龙井市| 曲麻莱县| 油尖旺区| 七台河市| 兴宁市| 岫岩| 永吉县| 阜阳市| 京山县| 恩施市| 定结县| 新兴县| 徐闻县| 沛县| 泊头市| 淳化县| 自贡市| 大连市| 康马县| 太和县| 水富县| 建平县| 苍溪县| 贵南县| 武宁县| 内江市| 霍州市| 德令哈市| 永年县| 南木林县| 锡林浩特市| 福建省| 兰溪市| 连江县|