综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / Society

Beijing to shut coal-fired boilers to clean up air

By Zheng Xin | China Daily | Updated: 2013-05-27 02:59

Beijing has vowed to eliminate most coal-fired boilers in the city center by the end of 2015 to reduce pollution from fine particulate matter, especially during the heating season.

After reducing coal use by 700,000 metric tons last year, the capital plans to cut another 1.4 million tons this year and use no more than 21.5 million tons, according to the 2013 coal consumption reduction plan released by the city's Environmental Protection Bureau and Commission of Development and Reform.

Beijing to shut coal-fired boilers to clean up air

Workers with the Beijing District Heating Group destroy two coal delivery channels with cranes on April 25, marking the beginning of the transformation of energy from coal to gas in the last coal-burning power plant in Beijing.?CHENG NING / FOR CHINA DAILY

The capital used 26.35 million tons of coal in 2010, the environmental bureau said.

Beijing still has a large number of coal-fired central heating boilers that give off large amounts of coal dust, and noise during the heating season.

Richard Saint Cyr, a family medicine doctor at United Family Health in Beijing, said he has noticed an uptick in discussions about the worsening air quality with many patients since winter.

He said that air pollution in the past winter was unusually serious and he had never witnessed such collective anxiety in Beijing.

Fine particulate matter poses a serious threat to people's hearts and lungs, he said.

Shang Wenchao, 28, a lifelong Beijing resident, said he used to clean his nostrils before going to sleep in winter because the air he breathed was filled with soot from burning coal.

"You have to wear a mask every day while outdoors or you would be eating coal," he said.

Shang said the situation is much better now, but the pollution is still worse in the winter because of the coal-fired boilers.

In response, the city's Environmental Protection Bureau is taking action has said it will replace coal-fired boilers within the Fourth Ring Road with clean energy by the end of 2015.

All coal-fired boilers with a capacity of generating 20 tons of steam per hour and above will be replaced with clean energy by the end of 2015, it said.

The last five coal-fired boilers at Shougang Machinery Co's heavy machinery branch in the Shijingshan district were shut down in March, making Shijingshan the third city district without coal-powered heating, after Xicheng district and Dongcheng district.

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
保亭| 荔浦县| 靖边县| 南丹县| 化州市| 新田县| 南陵县| 华宁县| 临清市| 凤冈县| 双江| 塔河县| 凌云县| 马公市| 仪征市| 连平县| 通榆县| 许昌县| 浦东新区| 平凉市| 南康市| 吉首市| 贵阳市| 宁乡县| 邵东县| 桓台县| 卢湾区| 北辰区| 潢川县| 会昌县| 长治县| 织金县| 五峰| 蚌埠市| 山东| 新沂市| 额敏县| 达日县| 无为县| 南华县| 安福县|