综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

China / Society

China technically prepares for Qinghai-Tibet Expressway

(Xinhua) Updated: 2014-10-07 20:46

XI'AN - The nation has the capability to build an expressway linking up Tibet autonomous region and Qinghai province in west China if major technical barriers are overcome, a chief technical consultant for the planned project said on Tuesday.

If China can overcome the technical barriers, an expressway linking Tibet autonomous region and Qinghai province in west China is feasible, a senior consultant with the project said Tuesday.

"Technically, we have the confidence to build the Qinghai-Tibet Expressway," Wang Shuangjie, Party chief of the CCCC First Highway Consultants Co., Ltd., said.

Heading a technical support team for the project, Wang said the primary technical barrier lies in the 500-km frozen earth belt along the planned 1,900-km expressway that links Tibet's regional capital of Lhasa with Qinghai provincial capital Xining.

Lhasa is the only regional capital that's not connected by China's expressway network, but the Sichuan-Tibet highway, along with Qinghai-Tibet highway and Xinjiang-Tibet highway, are the three major roads to Tibet.

Extreme conditions on the Qinghai-Tibet Plateau, such as high altitude, low oxygen content, strong solar radiation and freezing temperature, pose challenge to the expressway's construction and its future maintenance, Wang said.

The expressway will span areas where the average altitude is above 4,500 meters and annual average temperature below zero.

Wang and his team also need to address problems concerning the possible environmental effect of the expressway and come up with proper technology to repair the fragile ecological environment once it is damaged.

He said the suggestion to build the expressway based on the existing roadbed of the Qinghai-Tibet Highway is not feasible due to price.

Currently, China has completed the construction of the roadbed of the expressway's 300-km session between Xining and Caka in Qinghai, while construction of the 400-km session linking Xining with Golmud is still under way.

The rest of the 1,100-km section remains a hard nut to crack for engineers, but what was learned in building the high-altitude Qinghai-Tibet railway may help.

Opened in 2006, the highest railway in the world was lauded as an engineering feat for covering hundred of kilometers over harsh terrain and frozen ground.

China technically prepares for Qinghai-Tibet Expressway China technically prepares for Qinghai-Tibet Expressway

Xi stresses better transport for Tibet 

Passenger transport starts on Tibet's new railway 

 

Highlights
Hot Topics
...
千阳县| 张掖市| 临武县| 米脂县| 恩平市| 临澧县| 如东县| 黄龙县| 石渠县| 化德县| 神农架林区| 庆元县| 陇西县| 南陵县| 萨嘎县| 鄂州市| 理塘县| 咸阳市| 乌恰县| 民乐县| 康乐县| 台南县| 原平市| 上虞市| 陆良县| 景泰县| 祁门县| 中牟县| 庐江县| 饶河县| 即墨市| 溆浦县| 安溪县| 乃东县| 临安市| 武乡县| 毕节市| 延吉市| 泸溪县| 固原市| 芜湖县|