综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

USEUROPEAFRICAASIA 中文雙語Fran?ais
Home / World

Nuclear plants request restart

By Agencies in Tokyo | China Daily | Updated: 2013-07-09 07:10

 Nuclear plants request restart

Activists demonstrate on Sunday in Avignon, France, to protest against nuclear projects. Boris Horvat / Agence France-Presse

Japanese nuclear operators applied on Monday to restart reactors under new rules drawn up after the Fukushima disaster, but early approval is unlikely as a more independent regulator strives to show a skeptical public it is serious about safety.

The ruling Liberal Democratic Party of Japan and the utilities are eager to get reactors running again, with Prime Minister Shizo Abe singling out reining in soaring fuel costs as a key part of his economic reform plans.

But the pro-nuclear LDP has to tread carefully to avoid compromising the independence of the new regulator, which is battling to build credibility with a public whose faith in nuclear power was damaged after meltdowns at Tokyo Electric Power Co's Fukushima Daiichi station.

The Nuclear Regulation Authority has said it will take at least six months to review nuclear units, after which the consent of communities hosting reactors is needed.

The NRA calls the level of the nuclear regulations the world's toughest. Kyodo News said that utilities may also choose to give up efforts to restart some of the country's 50 commercial reactors and abandon them rather than investing in expensive safety measures.

Four regional utilities filed applications to restart 10 reactors at five nuclear power plants in Hokkaido, Fukui, Ehime and Kagoshima prefectures on Monday.

Among those applying for restarts, reactors that could power up before others include the No 3 unit at Shikoku Electric Power Co's Ikata plant in Ehime prefecture, which has been found not to have geologic faults and has already prepared a newly required seismic-isolated emergency response center, Kyodo News reported.

The regulations also stipulate reactors must have a venting system with filters that can reduce the amount of radioactive substances when pressure needs to be released from reactor containers during emergencies. However, pressurized water reactors such as the No 3 unit at the Ikata plant are given a five-year grace period to meet the requirement.

The requirements are stricter for aging units, which not only will have to comply with the new regulations but also undergo inspections to continue to operate beyond 40 years, according to local media reports.

All but two of Japan's 50 reactors have been closed following the disaster in March 2011, which forced 160,000 people from their homes, many of whom are unlikely to be able to return for decades.

Reuters-Xinhua

Nuclear plants request restart

(China Daily 07/09/2013 page12)

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
福泉市| 社旗县| 定襄县| 安塞县| 临西县| 洛隆县| 府谷县| 霞浦县| 阳泉市| 伊春市| 崇州市| 长治市| 古交市| 东城区| 北票市| 杨浦区| 石楼县| 项城市| 会同县| 盖州市| 乌鲁木齐县| 汕头市| 镶黄旗| 大埔县| 沽源县| 浮梁县| 从化市| 谢通门县| 牙克石市| 苏尼特右旗| 宜川县| 祥云县| 贡嘎县| 桐柏县| 德保县| 聊城市| 镇赉县| 纳雍县| 广平县| 神农架林区| 青海省|