综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Podcast

Nuke plant cooling system halted after 90-minute test


Updated: 2011-06-28 11:04
Large Medium Small

Get Flash Player

進入英語學(xué)習(xí)論壇下載音頻   去聽寫專區(qū)一展身手

A water recycling system crucial to progress at Japan's damaged nuclear power plant was halted for repairs on Monday after briefly resuming full operation.

Tons of fresh water has been pumped to cool the reactors since the Fukushima Daiichi plant was damaged by the March 11 earthquake and tsunami. That process taints the water with radiation, and 110,000 tons of contaminated water has accumulated and could overflow by early July.

Workers have struggled for weeks to use a new system that would clean the tainted water and reuse it in the cooling process. It fully operated for five hours earlier this month, and test-runs were conducted before it went fully operational and pumped treated water into the reactors on Monday.

But plant operator Tokyo Electric Power Co (TEPCO) said the system was halted about an hour and a half later. Workers spotted water leaking from a hose that was sending the processed water into the reactors, TEPCO spokesman Junichi Matsumoto said.

The system has reprocessed 1,850 tons of contaminated water.

The earthquake and tsunami destroyed power and cooling systems at the Fukushima plant, melting reactor cores and leaking massive amount of radiation. Some contaminated water had seeped into the ocean, causing criticism and concerns in and outside of Japan.

TEPCO and the government have said they hope to achieve a cold shutdown of the reactors by January by bringing the core temperatures to below 100 C.

TEPCO needs to decontaminate more than 100,000 tons of highly radioactive water that has built up during reactor cooling operations and prevented workers from accessing areas of the plant to make repairs.

The 9.0-magnitude earthquake triggered a tsunami that smashed into the Fukushima plant and knocked out reactor cooling systems, triggering meltdowns, explosions and radiation leaks in the world's worst nuclear accident since Chernobyl in 1986.

Questions:

1. How many tons of contaminated water has accumulated?

2. The cooling system was halted after how many minutes?

3. What was the magnitude of the earthquake that triggered the tsunami?

Answers:

1. 110,000 tons.

2. 90.

3. 9.0.

(中國日報網(wǎng)英語點津 Helen 編輯)

Nuke plant cooling system halted after 90-minute test

About the broadcaster:

Nuke plant cooling system halted after 90-minute test

Lee Hannon is Chief Editor at China Daily with 15-years experience in print and broadcast journalism. Born in England, Lee has traveled extensively around the world as a journalist including four years as a senior editor in Los Angeles. He now lives in Beijing and is happy to move to China and join the China Daily team.

分享按鈕
扎鲁特旗| 申扎县| 红原县| 兰考县| 灯塔市| 错那县| 通城县| 东明县| 四子王旗| 龙胜| 吕梁市| 永新县| 来凤县| 洪泽县| 雅江县| 龙井市| 岱山县| 潞城市| 新津县| 滨州市| 富蕴县| 冕宁县| 龙门县| 五指山市| 张家口市| 凤台县| 阿巴嘎旗| 科技| 江北区| 嘉定区| 栾川县| 金门县| 湘潭县| 濮阳县| 凯里市| 安多县| 从江县| 科尔| 大安市| 汝城县| 三台县|