综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

  .contact us |.about us
News > Lifestyle News ...
Search:
    Advertisement
Shanghai turn to waste to generate electricity
( 2003-10-11 15:11) (Eastday)

Following the unprecedented electricity shortage during the past scorching summer season, Shanghai is now turning to household garbage to generate power.

The Shanghai Yuqiao Garbage Incineration Plant, the first in the country that can process 1,000-ton household garbage daily, burns trash instead of coal to propel its two 8,500-kilowatt generators.

The core technology for the plant - located in Pudong New Area - is from the French government, which provided a US$30-million loan in the form of equipment to aid the 630-million yuan (US$76 million) project.

After two years' trial operation, it is now awaiting final evaluation by the State Environmental Supervision Station before it goes into formal operation.

The city government invested 170 million yuan in the project, and if it passes the evaluation, the Pudong New Area government will pay the plant 247 yuan per ton of garbage it burns.

The local power grid company pays a higher price to buy electricity from the plant - usually 0.2 to 0.3 yuan per kilowatt-hour higher than that from coal-fueled plants.

Once it begins official operation, the plant can generate 350,000 to 410,000 kwh electricity each day. In July, the hottest month when the scorching heat stretched the local power grid, it produced 12.05 million kwh power, of which 9.77 million was provided to the local power grid.

"Compared to power plants using coal, the electri-city we produce is really very small," said General Manager Huang Yucheng. "What's different is it initi-ates a new and environment-friendly method to utilize the waste in Shanghai."

According to Huang, the plant is now processing up to 1,200 tons of trash produced by Pudong's urbanized areas each day.

Meanwhile, a 1,500-ton garbage incineration plant in Jiangqiao, Jiading District, that can generate power is now ready and is scheduled to go into trial operation by the year's end.

It can provide 10 million kwh power each year.

 
Close  
   
  Today's Top News   Top Lifestyle News
   
+The next great leap after Shenzhou V
( 2003-10-21)
+Hu calls for balanced development
( 2003-10-21)
+Report: SARS not airborne virus
( 2003-10-21)
+Int'l AIDS group opens Beijing office
( 2003-10-21)
+Three astronauts board space station
( 2003-10-21)
+Landmark Disney concert hall dedicated in Los Angeles
( 2003-10-21)
+Growth of 30 percent Chinese babies impaired by lack of breast
( 2003-10-21)
+Increasing tourists flock to Tibet
( 2003-10-21)
+Hollywood actress-singer signs deal to produce TV talk
( 2003-10-21)
+China urged to build up talent pool of financial mathematicians
( 2003-10-21)
   
  Go to Another Section  
     
 
 
     
  Article Tools  
     
   
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
乌拉特后旗| 阿尔山市| 永安市| 砚山县| 博兴县| 阿坝县| 独山县| 澄迈县| 县级市| 边坝县| 府谷县| 阳西县| 长葛市| 平定县| 建昌县| 徐州市| 历史| 遵义市| 禹城市| 镇宁| 马鞍山市| 游戏| 永泰县| 宁夏| 南木林县| 吴江市| 博兴县| 台山市| 茂名市| 遂宁市| 崇信县| 克拉玛依市| 监利县| 汝州市| 增城市| 临武县| 武川县| 广元市| 开鲁县| 罗田县| 紫阳县|