综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / China

Public comment sought on Beijing-Xiongan rail

By Luo Wangshu | China Daily | Updated: 2017-07-24 07:09

Planners release environmental impact assessment for 100.3-kilometer corridor

An environmental impact assessment for a new high-speed railway linking Beijing and Xiongan New Area was released on Saturday. It was the first public acknowledgment that a new line will be built.

China Railway Design Corp announced the assessment on its website and is seeking public comment.

According to the notice, the Beijing-Xiongan railway will start at Liying in Beijing's Daxing district, pass through Langfang and terminate at Xiongan East Railway Station - a total length of 100.3 kilometers.

The new line will also pass through the capital's new airport, which will be about 36 km from Liying and about 64 km from Xiongan New Area. The airport is expected to open in 2019.

The existence of a railway plan was reported in April by Tianjin News. According to the report, a planning map showed two railway stations in the new area - Xiongan Railway Station and Xiongan East Railway Station. The environmental assessment covers the latter.

According to an earlier report, the Tianjin-Xiongan railway route will connect the area with Tianjin's new railway station, which is also in the planning stages.

An older rail line is already in operation. Passengers must transfer in Baoding or Tianjin to get to the Xiongan area on high-speed rail. Since July 7, four daily high-speed railway services have been started. The journey takes one hour and 50 minutes.

The new Beijing-Xiongan line follows a different route.

Xiongan New Area is located in the center of a triangular area defined by Beijing, Tianjin and Shijiazhuang, capital of Hebei province.

Located about 100 km southwest of downtown Beijing, the new area will mostly cover Xiongxian, Rongcheng and Anxin counties in Hebei.

It will eventually encompass 2,000 square kilometers, with a population of up to 2.5 million people.

Under the area's development plan, a major transportation network should be in place in Xiongan by 2020. The area will be well connected to Beijing, Tianjin and other cities in Hebei by 2022, when the Winter Olympic Games will be held.

Xiongan New Area is intended to house the bulk of Beijing's noncapital functions, including some administrative and public institutions, company headquarters, financial institutions, higher education institutions, and science and technology units.

luowangshu@chinadaily.com.cn

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
佛山市| 莱阳市| 阳泉市| 东光县| 江达县| 定安县| 大关县| 青川县| 中牟县| 罗平县| 定南县| 万盛区| 乃东县| 雅安市| 双流县| 额敏县| 石景山区| 焦作市| 泗水县| 婺源县| 乌审旗| 法库县| 彭水| 贺州市| 垦利县| 读书| 昔阳县| 随州市| 乌鲁木齐县| 赣州市| 镇康县| 余干县| 贺州市| 平塘县| 五莲县| 梁山县| 昌图县| 泊头市| 康马县| 德化县| 察隅县|