综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

 

Home / Press/ News

President of Spain's Villa Mir Group inspects CGGC

Updated: 2010-03-28

On March 26, 2010, a four-member delegation headed by Gonzalez, president of Spain Villamil Energy Group, visited the Chengdu-based headquarters of Gezhouba Group No 2 Engineering Co for inspection.

Read more

 

First 150 houses in the housing construction project in Libya have roofs sealed

Updated: 2010-03-13

On March 10, 2010, the first 150 out of 7,300 houses undertaken by China Gezhouba Group Co in Eljebel Elgharbi and Nalut of Libya topped off.

Read more

 

CGGC signs agreement with Indonesian Government and enterprises

Updated: 2010-03-11

On March 8 and 9, China Gezhouba Group Co signed in Beijing a cooperation agreement on the infrastructure project with Indonesian Bappenas, West Sulawesi provincial government and Indonesia’s National Power Company.

Read more

 

Pakistani officials and Chinese ambassador visit the staff of NJ Project

Updated: 2010-02-16

On Feb 14, 2010, Rehman Malik, Federal Minister for Interior of Pakistan, inspected the NJ Project undertaken by CGGC, accompanied by Luo Zhaohui, Chinese ambassador in Pakistan, and Raja Muhammad Farooq Haider Khan, Prime Minister of Kashmir.

Read more

 

Semega: "Chinese Speed" stuns the world

Updated: 2010-02-15

On Feb 12, 2010, CGGC began to erect the precast beams for the floor of the Bamako No3 Bridge, marking the start of the bridge floor construction.

Read more

 

The contract on Hydropower cascade development of Chilik River is worth more than $700m

Updated: 2010-02-13

According to China Gezhouba Group Co, the company and Xinjiang International Economic Cooperation Co established a joint venture on Feb 9, 2010, with the former as the principal part.

Read more

 

Taoussa Hydropower Station begins to be constructed

Updated: 2010-02-10

On Feb 6, 2010, Taoussa Hydropower Station Project in Mali, undertaken by CGGC, officially kick-started, and Mali President Amadou Toumani Toure and Chinese Ambassador in Mali Zhang Guoqing attended the celebration ceremony.

Read more

 

CGGC signs with Mauritania an EPC contract worth 1.36b yuan

Updated: 2010-02-10

According to China Gezhouba Group Co. The company signed with the Drainage Bureau under Mauritania Ministry for Hydraulic and Energy a contract agreement.

Read more

 

The construction of the main part of Simutasi Hydropower Station is in full swing

Updated: 2010-02-10

On Feb 8, 2010, a contract on the power generation system of the dam and outlet works of Simutasi hydropower station was signed in Yichang.

Read more

 

The right piles of Bamako No 3 Bridge finished

Updated: 2010-02-04

On Feb 2, 2010, CGGC finished the grouting of all right piles of Bamako No 3 Bridge, making it possible to link up the whole bridge before the yearend.

Read more

 


|<<    21   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

衡阳市| 阿拉善右旗| 龙门县| 康平县| 都安| 盖州市| 双城市| 嘉兴市| 上蔡县| 新乡市| 九龙坡区| 巴楚县| 桐梓县| 福泉市| 西吉县| 宜阳县| 荣昌县| 枣强县| 镇平县| 黄大仙区| 天津市| 吉首市| 临汾市| 南召县| 盐津县| 永康市| 平江县| 东方市| 海城市| 龙口市| 阿克陶县| 云和县| 禹州市| 县级市| 横山县| 海口市| 安吉县| 阿拉尔市| 石棉县| 高青县| 屯留县|