综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

USEUROPEAFRICAASIA 中文雙語(yǔ)Fran?ais
Regional/ Latest news

Construction of Sri Lankan Kaluganga Dam is going smoothly

en.powerchina.cn | Updated: 2017-06-23 13:39

The construction of the main dam for the KaluGanga Dam project in Sri Lanka is under construction currently.

The project includes a main dam, sub-dam, spillway, diversion tunnel, bottom orifice, water conveyance tunnel, irrigation tunnel, right bank orifice for the sub-dam, and more.

The project's contract period is 57 months, with an additional two-year guarantee period. The project started on April 2, 2014 and is expected to be completed on Dec 25, 2018.

The plan is to fill 3.5 million cubic meters of concrete for the main dam annually. To date, 1.98 million cu m have been filled.

Constructors carried out a field survey on June 15, 2017 and increased the daily fill amount from 7,000 cu m to 10,000 cu m to make sure the project will be finished on time.

 

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
宁蒗| 凤台县| 弥渡县| 阿图什市| 屏边| 定远县| 昌黎县| 定襄县| 应用必备| 永登县| 锦州市| 蓝田县| 盘锦市| 奉新县| 东乌珠穆沁旗| 青海省| 英吉沙县| 寿阳县| 旅游| 黔江区| 宜春市| 喜德县| 巴中市| 冕宁县| 东丰县| 姜堰市| 积石山| 大余县| 汕尾市| 宝鸡市| 眉山市| 宿迁市| 惠东县| 吐鲁番市| 金华市| 农安县| 商水县| 白水县| 洞头县| 房山区| 桂阳县|