综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Shandong

Nuclear power project starts

By Zhao Ruixue (China Daily Shandong Bureau)
Updated: 2009-12-29 16:00
Large Medium Small

The first phase of building two giant reactors for a new nuclear project that will cut carbon emissions and boost the local economy started December 28.

Two 1250 mW reactors will be built in the first phase, at the site in Haiyang, east China's Shandong province, and are scheduled to be put into use in May 2014 and March 2015 respectively.

Related readings:
Nuclear power project starts China's nuclear power giants ink $776M contract
Nuclear power project starts Nuclear power plants set to go inland
Nuclear power project starts Construction of Taishan nuclear power plant begins

The entire nuclear project will have eight reactors with a total capacity of 10000 mW.

All of the reactors will use the third-generation AP1000 technology developed by the US-based Westinghouse Co.

Shandong Nuclear Power under the China Power Investment Corporation is in full charge of the project's design, construction, operation and management.

Annual power output is expected to reach 17.5 billion kw when the first two reactors are completed, easing Shandong's power tension and optimizing the province's power structure.

In addition, the large amount of investment on the nuclear project will promote the local economy and drive domestic demand to grow.

When completed, the eight reactors will cut carbon emission by at least 50 million tons, nitrogen oxides by 150,000 tons and dust emission by 120,000 tons annually, compared with the same-scale coal steam-electric plants.

康马县| 密山市| 道孚县| 平乡县| 土默特左旗| 保德县| 娱乐| 社旗县| 广丰县| 留坝县| 中山市| 奎屯市| 集贤县| 新安县| 新建县| 肇东市| 沅陵县| 台南县| 右玉县| 东乌| 丰宁| 章丘市| 曲周县| 信丰县| 嵩明县| 灵台县| 个旧市| 米易县| 图木舒克市| 平利县| 彭州市| 乡城县| 南漳县| 大连市| 白银市| 凤台县| 会昌县| 沙坪坝区| 广宗县| 延川县| 卢湾区|