综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

 
 
 
Home> News

Freight rail tunnel breaks through early

( China Daily )

Updated: 2018-05-28

Freight rail tunnel breaks through early

Welders work on supporting structures inside the Dazhongshan Tunnel earlier this month in Sanmenxia, Henan province. [Photo by China Daily]

Workers on Sunday morning completed the digging of a tunnel for the world's longest heavy-freight railway-which will stretch from coal-rich northern China to the country's central provinces-five months ahead of schedule, the project contractor said.

The 14.5-kilometer Dazhongshan Tunnel is being built in Sanmenxia, Henan province, by Shanghai Civil Engineering Co, a subsidiary of China Railway Engineering Corp.

It is an essential part of the Inner Mongolia-Jiangxi Railway coal freight project, which is 1,837 km long and expected to carry about 200 million metric tons a year from the Inner Mongolia autonomous region and Shaanxi and Gansu provinces to central China, including Hubei, Hunan and Jiangxi provinces.

Construction of the railway began in 2015, with total investment expected to reach about 190 billion yuan ($29.7 billion). It will run through seven provinces and regions, with work scheduled to be completed in October next year.

The railway will help optimize the country's distribution of energy resources. Coal resources in the north can be used to provide energy for the provinces of central China, said Zhang Guijun, the project's manager.

"With its economic value and standardized construction, the railway will be a new brand of Chinese railway after it goes into operation," he said.

Zhang Lin, chief engineer for the Dazhongshan Tunnel project, said building the railway is a massive challenge, as the route crosses the Yellow River twice, as well as the Yangtze River and complex mountain ranges.

The tunnel is in Sanmenxia's mountainous Lushi county.

"Most of it is 80 to 500 meters from the surface. The deepest point is 710 meters," Zhang said. "Digging the tunnel has been hard and risky."

He said workers came across 12 geological faults, endured temperatures of up to 50 C and experienced water bursts, but no one died because of the project's high degree of mechanization and careful planning.

Zhang said the team had also worked hard to protect the environment. Lushi county is an important water resource for the middle line of the South-North Water Diversion Project.

Wang Zhibing, another chief engineer, said the company processed more than 400,000 cubic meters of excavated rock and used it in construction.

The team also tried to help poverty-stricken local families by drilling several water wells and hiring local residents to work on the project, he added.

Copyright ? 2013 China Daily
All Rights Reserved
Sponsored by Sanmenxia Municipal Government
Powered by China Daily

巩义市| 杨浦区| 黄石市| 盐亭县| 仲巴县| 灵山县| 淳化县| 工布江达县| 芦溪县| 吉水县| 新丰县| 金阳县| 佛教| 石河子市| 浑源县| 宜兰市| 葫芦岛市| 辽宁省| 彭阳县| 林甸县| 通化市| 抚松县| 稷山县| 阳朔县| 崇文区| 思南县| 长葛市| 吉林市| 台东市| 潍坊市| 合水县| 永德县| 浮山县| 横峰县| 遂平县| 共和县| 许昌县| 浦东新区| 阿城市| 广德县| 虎林市|